Inspection Search Results
NAVIGATION
Home
Search Programs
Search Permits
Search Facilities
Search Inspections
Search Violations
Search Enforcement Actions
Search Releases
Delaware Open Data Portal
Non-Site Specific Reports
Search by Map (Beta)
INSPECTION SEARCH
Enter your search criteria below. All fields are optional, but at least one field is required.
Inspection Occurred Between:
And:
Type:
Erosion Construction
Compliance Evaluation Inspection
Erosion Maintenance
Erosion Standard Plan
Reconnaissance Inspection
Compliance Sampling Inspection
Erosion Closeout Inspection
Erosion Plan Review
Annual Report-AR
Compliance Certification Rpt Reviewed-1M
Compliance Status Rpt Received-CT
Cylinder Gas Audit-4M
File Review-FR
General Non-Level 2 State Inspection-GI
Linearity Check-8M
Malfunction Notice Received-MN
New Source Performance Test-73
Preliminary Engineering Review-22
Relative Accuracy Test Audit-6M
Source Operator Stack Test-15
State Air Inspection-08
State Observed CEM Perf Spec Test-17
State Observed Stack Test-18
State Stack Test-15
VOC Sample Taken-VC
*8YBIF Record Review (03)
*8YBIF Record Review (DE)
*8YIncinerator Inspection (03)
*8YIncinerator Inspection (DE)
*CEI Without Substantial Sampling
*CME Without Substantial Sampling
*Compliance (GW) Monitoring Evaluation
*Comprehensive & Coordinated Inspct w/CEI
*Corrective Action Oversight
*Detailed Multimedia Inspection w/CEI
*Multimedia Screening Checklist Only
*Other Evaluation
*Sampling Inspection
Case Development Inspection
Compliance Assistance Activity
Compliance Evaluation Inspection On-Site
Compliance Schedule Evaluation
Corrective Action Compliance
Facility Self Disclosure
Financial Record Review
Focused Compliance Inspection
Follow-up Inspection
Groundwater Monitoring Evaluation
Land Restriction Component
No 3007 Information Request Received
Non-Financial Record Review
Not A Significant Non-Complier
Operation And Maintenance Inspection
RCRA CEI Performed w/Screening Checklist
Significant Non-Complier
Well Pre-Installation Site Inspection
Well On-Site Construction Installation Inspection
Well Post-Installation Site Inspection
01-Notify Agency
02-Activity Authorized
03-In accordance with Reg
04-Class C Inspection
05-Class E Installations
06-Class E Supervise
07-Class E Minimums
08-Class E Call-in
09-Unknown
Annual Report Received/TV-CB
Authorization to Cover without Dept. Inspection
Brownfield Assessment I
Brownfield Assessment II
Class H Inspection
Class I Cap Inspection
Class I Inspection
Closing Inspection
Closing Inspection
Closure Inspection
Closure/Abandonment Inspection
Closure/Abandonment Inspection
Complaint Inspection
Complaint Received - Odor
Compliance Assistance
Compliance Assistance
Compliance Biomonitoring Inspection
Compliance Certification State Review-SN
Compliance Oversite
Construction Inspection
Construction Inspection
Construction Inspection
Construction Inspection
Construction Inspection
Corps of Engineers Inspection
CSO Inspection
Diagnostic
DNREC Cap Inspection
DNREC Cover Inspection
DNREC Random Inspection
Emergency Response/Complaint Response
Emergency Response/Complaint Response
Emergency Response/Complaint Response
Enforcement Case Support
Engineer Cap Inspection
Engineer Inspection
Engineering Control Inspection
Engineering Design Study
Facility Evaluation
Feasiblity Study
Field Audit Inspection
Final Plan
Fuel Sampled-78
Full Air Compliance Evaluation-FS
GDV - Self Inspection
Industrial User Inspec w/ Pretreatment Audit
Industrial User Inspection
Initial Investigation
Inspection - Incident
Interim Action
LTS Re-evaluation
LTS Remedy Re-evaluation
Mechanical Integrity Test
Mechanical Integrity Tests Witnessed
Mechanical Integrity Tests Witnessed
Mechanical Integrity Tests Witnessed
Monitoring - Ground Water
Multimedia
Multimedia Inspection-MI
Non-MDR Stack Test
Notification Received-RN
Obervation-OB
Off-site 3rd party Inspection Report Review
Off-site AST Facility Meeting
Off-site Compliance Documentation Review
Off-site FR Documentation Review
Off-site Installation Documentation Review
Offsite File/Data Review
On-site Facility Compliance Inspection
On-site Installation Compliance Inspection
On-site Installation Compliance Inspection
On-site Observation of 3rd party Inspection
On-site Permanent Closure Compliance Inspection
On-site Permanent Closure Compliance Inspection
On-site Release Investigation
On-site Release Investigation
On-site Relocation Compliance Inspection
On-site Removal Compliance Inspection
On-site Repair Compliance Inspection
On-site Retrofit/Upgrade Compliance Inspection
On-site Retrofit/Upgrade Compliance Inspection
On-site System Failure Inspection
On-site Tank Compliance Inspection
Other
Other
Other
Other
Other Action
P/O Inspection-PO
Partial Air Compliance Evaluation - Off-site-PX
Partial Air Compliance Evaluation - On-site-PS
Performance Audit
Post Completion Inspection
Preliminary Assessment/Site Investigation
Pretreatment Audit
Pretreatment Compliance Inspection
Pretreatment Followup Inspection
Proposed Plan
Quarterly Report-84
Receipt of Stack Test Report
Recon Inspection
Regular LTS
Remedial Action
Remedial Design
Remedial Investigation
Remedy Evaluation Review
Repair Inspection
Replacement Inspection
Review - Facility File
Review - Off-site 3rd party Inspection Report
Review - Referral from 3rd party
Review - Referral from another Department
Routine/Periodic Compliance Inspection
Routine/Periodic Compliance Inspection
Routine/Periodic Compliance Inspection
Self-Reported Noncompliance
Semiannual Report-85
Septic Compliance Inspection
Septic Holding Tank Inspection
Septic IA O&M Inspection
Septic IA Triennial Inspection
Site Characterization Study
Site Inspection
Sludge Inspection
Source Shutdown -06
Spill
Startup Inspection
State Multimedia Inspection-SI
Stormwater Inspection
Toxics Inspection
TV ACC Receipt/Review
Unauthorized Cover
Vapor Recovery 3 Year CPM Test
Vapor Recovery Annual Test
Vapor Recovery Inspection
Vapor Recovery Post Construction Test
Vapor Recovery Quarterly Test
Vapor Recovery Re-Test
Preliminary Assessment
Inspection-Compliance Evaluation
Inspection-Compliance Sampling
Inspection-Reconnaissance or Screening
Inspection-Case Development
Review - Off-site 3rd party Inspection Report
Review - Referral from 3rd party
Review - Referral from another Department
Review - Facility File
On-site Observation of 3rd party Inspection
On-site Removal Compliance Inspection
On-site Relocation Compliance Inspection
On-site Repair Compliance Inspection
On-site Tank Compliance Inspection
On-site Facility Compliance Inspection
Off-site 3rd party Inspection Report Review
Offsite Record Review-Required
Off-site FR Documentation Review
Off-site Installation Documentation Review
Off-site Compliance Documentation Review
Offsite Record Review-Self-Policing Submission
Meeting with Corporation
Offsite Full Compliance Evaluation
Offsite Record Review-Voluntary
Information Request
Compliance Investigation
Outcome:
NO Violation(s) Found
Violation(s) Found-All NOT Immediately Corrected
Violation(s) Found-All Immediately Corrected
Violation(s) Found - Previously Corrected
Pending/Under Review
No Compliance Monitoring (Facility Shut Down)
No Compliance Monitoring (Access Denied)
Action Achieved
Action Completed
Action In Progress
Action Not Achieved
Action Rescheduled
Additional Information Requested
Annual Compliance Certification Indicates Violations
Annual Report Indicates Compliance
Annual Report Indicates Unknown Compliance
Awaiting Compliance Determination
Compliance Monitoring report deficient
Delivery Prohibition-Imminent Threat-Field Notice
Delivery Prohibition-Imminent Threat-Prior Notice
Delivery Prohibition-Non-Imminent Threat-Prior Notice
Design Completed
Design Underway
Disapproved
Discuss Modifications or Construction Status
Discuss Violations
Drain/Well Found
Drain/Well Not Present
Engineering Control in Good Condition
Engineering Control Needs Repair
Extension of Five Year Review
Fail
Failed Emissions/Stack Test
Failed Test or Audit
In Compliance
In Compliance by emissions test
In compliance with O & M Plan
In Violation - Late Report
Incomplete
Investigation Completed
Investigation Underway
Meeting Compliance Schedule
Not In Compliance with O&M Plan
Not in Operation
Outcome Unresolved - Follow-up Action Needed
Pass
Passed Audit
Passed Emissions/Stack Test
Plan Completed
Plan Underway
Re-Test Required
Recommendations Made
Samples Collected
Satisfactory
Satisfactory w/concerns
Unsatisfactory
Visible Emissions Observed
Warning
Program:
Aboveground Storage Tanks
Accidental Release Prevent
Air Program
Animal Operation
Artificial Reef
Brownfields
Combined Sewer Overflow
Dredge Spoil Disposal
Gasoline Tank Trucks
Hazardous Waste Corrective Action Site
Hazardous Waste Generator
Historic/Monument Site
Infectious Waste
Land Development Erosion Control
Nature Preserve
Non-Tank Related Petroleum Impact
Open Space
Other Recreational Areas
Park
Petroleum Vapor Recovery
Playground
Remediation Section
Salvage Yard
Septic System
Solid Waste General
Solid Waste Landfill
Solid Waste Recycling
Solid/Infectous Waste Transfer Station
Tire Pile (Waste)
Underground Storage Tank
Unpermitted Landfills/Dumps
Waste Transporter
Wastewater(NPDES)
Well
Wetlands - Basic Application
Wildlife Area
Aquatic Pesticides
Biosolids
Floor Drains & Brine Wells
Groundwater Discharge-Large Wastewater Systems
Industrial Storm Water
Letter of Intent To Dispose of Sewage
Non Hazardous Waste Transporter
Non-Septic Injection Wells
Solid Waste Beneficial Use
Storm Water Project Tracking
Surface Water Ambient Monitoring
Download Options:
Select a report format
PDF
CSV